Anti-dumping · Investigation 691铝门窗反倾销初裁 · 691 案
Order stalled by anti-dumping securities? Get a quote you can hold.订单被反倾销保证金卡住了?
拿一份能锁定的报价。
Preliminary securities on aluminium windows and doors from China started on 15 October, and many quotes have been re-priced or withdrawn. SMIRO quotes in AUD, locks the price when you sign, and handles customs and securities for you. Send the plans and we will quote fast.10 月 15 日起,中国出口的铝门窗开始缴纳临时保证金,不少订单被重新报价甚至撤回。SMIRO 以澳元报价,签约即锁定价格,清关和保证金都由我们办理。图纸和能效表给得越完整,报价越快。

- Price价格
- Locked in AUD澳元锁价
- Customs清关
- Handled by us我们办理
- Lead time交期
- 8–12 weeks8–12 周
Preliminary findings, final decision pending · Notice TRN 2026/147初裁结果,终裁待定 · 公告 TRN 2026/147
Securities are set exporter by exporter.保证金按出口商分别计算。
The same window from two different exporters can attract securities more than three times apart at the border. That is why some orders simply got dearer while others stopped altogether.同一类门窗,来自不同出口商,在边境要缴纳的临时保证金可以相差三倍。这也是为什么有的订单只是变贵,有的却直接停了。
- Notice公告编号
- TRN 2026/147
- Investigation调查案件
- No. 691
- Published发布日期
- 14 Oct 2026
- Securities apply from生效日期
- 15 Oct 2026
- Individually examined exporters单独核查的出口商
- 5.3–51.6%
- Residual exporters残余出口商
- 24.4%
- Non-cooperating and all other exporters未应诉及其他出口商
- 73.3%
- Submissions on the SEF due基本事实陈述(SEF)意见截止
- 3 Nov 2026
- Final recommendation due终裁建议提交期限
- 16 Dec 2026
Switch supplier. Don’t start over.换供应商,不必从头再来。
An Australian company with the paperwork in order, so a stalled order can move again.澳洲本地公司,文件齐全,让被卡住的订单重新走起来。
Competitive pricing, locked in AUD价格有竞争力,签约锁定澳元
SMIRO was competitively priced before the measure and still is. The price is fixed when you sign; if the final rate changes or duty is applied retrospectively, we absorb it.SMIRO 的价格在反倾销之前就有竞争力,现在也一样。合同签订后价格不再变动,终裁税率调整或追溯征税,都由我们承担。
An Australian company澳洲本地注册公司
SMIRO Engineered Systems Pty Ltd (ABN 90 697 018 152) holds the contract, the invoice and the aftercare, here in Australia.SMIRO Engineered Systems Pty Ltd,ABN 90 697 018 152。合同、发票、售后都在澳洲本地主体名下。
Customs and securities handled清关与保证金由我们办理
No import paperwork for you and no securities to fund yourself. Quotes and orders are handled locally.你不需要处理进口手续,也不用自己垫付保证金。报价、下单都在本地对接。
AS 2047 documentation产品具备 AS 2047 相关文件
Documents go straight to your certifier, so switching supplier does not stall sign-off.认证文件可直接提供给认证师,不会因为换供应商而卡在验收。
How it works三步报价
Three steps from enquiry to production.从提交到排产,只需三步。
- 01
Send the form提交报价表
Attach drawings and the energy schedule. The more complete they are, the faster the quote.附上图纸和能效表,资料越完整报价越快。
- 02
Review the quote收到报价
Check the specifications and quantities, and confirm the details.核对规格与数量,确认细节。
- 03
Confirm the order确认下单
Pay the deposit to book production. Lead time is typically 8–12 weeks.支付订金后排产,交期一般 8–12 周。
Get a quote在线报价
Send us the project.把项目发给我们。
No drawings yet? Send the enquiry anyway and we will reply first.暂时没有图纸也可以先提交,我们会先回复。
- Your name and one contact detail is enough to start留下姓名和一个联系方式即可开始
- Drawings and the energy schedule can follow later图纸和能效表可以后补
- Typical lead time of 8–12 weeks from deposit收到订金后交期一般 8–12 周
What should I prepare?要准备什么资料?
Project drawings and the energy-efficiency schedule. If you do not have them yet, send the enquiry first and forward them later.项目图纸和能效表。暂时没有也可以先提交,图纸后续补发。
How long is the lead time?交期多久?
Typically 8–12 weeks from order confirmation and deposit.确认订单并收到订金后,一般 8–12 周。
How do I reach you?怎么联系你们?
Use the form on this page, or email info@smiro.com.au.在线填写报价表,或发邮件到 info@smiro.com.au。